Diagnostic & Treatment

Barnes Jewish Hospital Hybrid Operating Room

This project relocated the existing Fixed Fluoroscopy equipment from the Cardiovascular Procedure Center (CPC) to the 3rd floor of the Southwest Tower. The project converted two smaller OR’s into one large imaging/operative suite. The adjacent sub-sterile was removed and an electrical closet was modified to accommodate the fluoroscopy equipment. Minor work was required in the existing CPC area after the equipment was removed. This work included floor/ceiling repair, minor cabinetry, and electrical work.


<< View All Healthcare Projects

01 Special Features & Challenges

The challenge of these types of special modalities includes the coordination of the ceiling mounted radiology equipment along with multitude of ceiling mounted boom / columns / OR Surgical lighting equipment, etc. Other challenges include the build out of a space within an active / functioning OR suite

02 Location

St. Louis, MO

03 Completion Date

8/21/2009

04 Square Footage

1,500

05 Services

Schematic Design, Design Documentation, Contract Documents, Bidding & Negotiation, Construction Administration, Interior Design, Equipment Planning, Technical Coordination